仮桟橋部材を活用した緊急仮設橋の主桁連結構造に関する実験的研究
岑山 友紀杉本 悠真東 博年江頭 慶三杉田 圭哉山口 隆司
著者情報
ジャーナル フリー

2018 年 64A 巻 p. 594-604

詳細
抄録

Recently the temporary emergency bridge has been developed by the Ministry of Land, Infrastructure and Transport to minimize disaster damage. The temporary emergency bridge is limited to traffic of emergency vehicles only and be erected within 72 hours called for criteria of lifesaving in time of disaster. On the other hand, temporary work girdersis often used in construction work, and it is expected that temporary work girders will be utilized as the temporary emergency bridge. In this study, for the purpose of shortening construction time, we propose to use a tensile joint for temporary works girders. As a result, it is confirmed that the proposed tensile joint has sufficient rigidity. We also examined the design method.

著者関連情報
© 2018 公益社団法人 土木学会