詳細検索結果
以下の条件での結果を表示する: 検索条件を変更
クエリ検索: "鉄筋工事"
343件中 1-20の結果を表示しています
  • 新妻 尚祐, 樋脇 毅, 工藤 桂一, 中田 善久, 大塚 秀三, 鈴木 直, 宮田 敦典, 荒巻 卓見
    日本建築学会技術報告集
    2016年 22 巻 50 号 5-10
    発行日: 2016/02/20
    公開日: 2016/02/20
    ジャーナル フリー
    Reinforcement placing of concrete buildings are becoming increasingly overcrowded or advanced in response to high earthquake resistance and high durability. Therefore, reinforcement processing and placing becomes more difficult, sometimes interpretation of reinforcement placing varies from each person. However, actual state of reinforcement placing from reinforcement contractor’s standpoint has not been fully elucidated. The purpose of this study is to investigate the actual state of reinforcement placing by the questionnaire survey targeted to reinforcement contractors. As a result, this paper showed the actual state of reinforcement placing about contract system, calculation, working drawing, construction scheme and construction method.
  • 志手 一哉, 安藤 公一
    プロジェクトマネジメント学会誌
    2009年 11 巻 2 号 3-8
    発行日: 2009/04/15
    公開日: 2017/11/15
    ジャーナル 認証あり
    建築業はプロジェクトごとに組織体が異なるため,継続した生産性の向上が難しい.生産性向上に向けた要点を可視化するには,目的を明確にした作業測定が有効である.本稿では少人化に着目した建築プロジェクトの作業測定や分析の事例を述べ,建築施工における改善促進フレームワークを考案する.
  • 新妻 尚祐, 工藤 桂一, 樋脇 毅, 中田 善久, 大塚 秀三, 宮田 敦典, 荒巻 卓見
    日本建築学会技術報告集
    2020年 26 巻 63 号 445-448
    発行日: 2020/06/20
    公開日: 2020/06/20
    ジャーナル フリー

    In reinforcement construction, making a shop drawing and inspection of bar placement are matter of cardinal importance. However, there are no reports investigating these actual states and problems. Therefore, the purpose of this study is to investigate problems and actual state of shop drawing and fabrication book, and construction control and inspection of bar placement. As a result, this paper showed the actual state of reinforcement have worked for under the leadership of the reinforcement contractors. And, there has been a difference of instruction contents for each position who carry out inspection of bar placement.

  • 唐 奇紅, 川津 行弘, 横尾 昇剛, 岡 建雄
    空気調和・衛生工学会大会 学術講演論文集
    2007年 2007.2 巻 I-32
    発行日: 2007/08/24
    公開日: 2017/08/31
    会議録・要旨集 フリー
    The purpose of this study is to show the factor of energy consumption and CO_2 emission associate with building construction. Energy consumption and CO_2 emission associate with building construction is analyzed by 2 case studies. The following is shown by the case studies. -The intensity of energy consumption and CO_2 emission on the input materials for building construction is improving. -The input amount of materials for building construction is increasing on the equipment mainly.
  • 小林 敏道, 苫米地 司, 干場 信司
    農業施設
    2000年 30 巻 4 号 365-372
    発行日: 2000/03/25
    公開日: 2011/09/05
    ジャーナル フリー
    本研究では, 積雪寒冷地域に建設される畜舎施設を対象とし, 1997年3月に制定された畜舎設計規準に基づいて設計した場合の建設コストについて検討を行った。積雪寒冷地域で畜舎を計画する場合には, 温暖地域に比べて外力として加わる積雪荷重と基礎構造の設計に用いる凍結深度が大きくなる。これらの積雪荷重および凍結深度の差異が建設コストに与える影響を, 平屋・切妻屋根の鉄骨構造畜舎を対象として分析した。対象とした畜舎は北海道内で一般的に建設されている畜舎をモデル化したものである。50kgf/m2ごとに400kgf/m2まで変化させた積荷重と, 400mmから1,200mmまで200mmごとに変化させた凍結深度を組み合わせた設計条件で構造設計を実施し, 畜舎施設における建設コストの大部分を占める躯体工事費を積算した。積算は, 躯体工事である土工事,
    鉄筋工事
    , 型枠工事, コンクリート工事および鉄骨工事について行った。垂直最深積雪量が1m以上の多雪区域における躯体工事費は凍結深度を一定とした場合, 積雪荷重100kgf/m2の増加にともない約8%増加する。また, 積雪荷重を一定とした場合, 凍結深度200mmの増加にともない約6%増加する。さらに, いずれの場合も土工事,
    鉄筋工事
    , 型枠工事およびコンクリート工事の基礎工事にかかわる総工事費が躯体総工事費の50%以上を占め, 凍結深度が深くなるとともに基礎工事費の占める割合が増加する傾向が明らかになった。
  • 村田 裕介, 有森 正浩, 鈴木 信行
    土木学会論文集F4(建設マネジメント)
    2015年 71 巻 4 号 I_149-I_156
    発行日: 2015年
    公開日: 2016/03/31
    ジャーナル フリー
     公共工事の入札時における予定価格の設定や工事の実行予算の策定,工事実施中におけるコスト管理などに用いられる建設資材価格等について,毎月実施する定期調査間のタイムラグによる影響の抑制や,応札者における取引先等との実勢価格の妥当性を評価するために,定量的な分析を行い物価変動によるリスクに対応した客観的かつ精度の高い資材価格等の予測モデルの構築を行った.
     分析は予測価格を目的変数とし,今月の価格,前月から今月の価格変動率,実績価格との乖離率から求めた次月の市況気配を説明変数とする重回帰分析を行った.分析結果の評価方法は,予測値の実績値に対する相対誤差により評価した.その結果,過去の価格情報を使用して算出された価格と比較することで検証を行ったところ,精度の高い予測モデル構築手法を考案することができた.
  • 朱 成敏, 岡田 忠, 武田 英明
    人工知能学会第二種研究会資料
    2019年 2019 巻 SWO-049 号 05-
    発行日: 2019/11/22
    公開日: 2021/09/17
    研究報告書・技術報告書 フリー

    職業現場は様々な業務で構成されており、それぞれの業務には異なる能力やスキルが必要とされる。業務に必要な要素を明確にすれば就業者の特徴に適合する業務の検索が容易となり、社会における生産性の向上にも繋がる。しかし、こういった職業に関する情報がなく、採用関係者の経験による独自の判断で行われている。そこで、本研究では厚生労働省が発行している職業能力に関する評価基準を用いて職業情報を抽出し、データ化する。また、そのデータを分析し、意味的要素を発見することで職業における知識体系の構築への可能性を検討する。

  • 大幢 勝利, 北條 哲男
    会議録・要旨集 オープンアクセス
    我が国の建設業において、頻発する墜落災害は最も深刻な問題の一つである。このような労働災害を防止するため、手すり先行工法に関するガイドラインの制定等、その対策が強化されてきた。しかし、建設業における墜落による死傷災害の発生割合は依然として高い水準にある。そこで、本研究では、建設業の墜落災害要因を視覚化し安全教育に使用するため、労働局の調べた労働災害データベースを分析した。その結果、足場からの墜落が最も頻発する墜落災害であることを明らかにした。
  • - 総合建設会社と専門工事会社の事例を題材として -
    曽根 巨充, 田中 大士, 志手 一哉
    日本建築学会計画系論文集
    2018年 83 巻 754 号 2359-2369
    発行日: 2018年
    公開日: 2018/12/30
    ジャーナル フリー
     In this paper, we are targeting on reinforcement works which has serious influence on the quality of the superstructure from among various kinds of construction work, focusing on information necessary for the building process from design to construction. We clarified the issue for utilize information on reinforcing work by Field survey and analysis. As a result of this, we will summarize basic knowledge on new methods of management of production information utilizing ICT.
     We investigated the workflow of the reinforcing bar bending factory, interviewed the rebar sub-contractors and observed the reinforcing work on the construction site; therefore, we grasp of the production information in the reinforcing work in detail. In addition, we investigated where ICT is used in the flow of information. As a result, the following knowledge was obtained.
     1) Production process can be categorized into four types, "drafting", "bar bending", "placing of rebar", "inspection".
     2) Information on the management items "drafting" and "inspection" is obtained from the structure drawing and the construction drawing. Because their information is an element unit.
     3) Management items of "bar bending" and "placing of bar" obtain information from "bending schedule" and "bending instruction tag". Because their information corresponds to materials.
     4) The digital information of the rebar bending process is used to create of "reinforce drawing", "bending schedule", "bending instruction tag", and it is applied to progress management and inspection in the reinforcing bar bending factory. Among them, software that creates "bending instruction tag" is developed by reinforcing bar bending factory himself.
     In addition to hearing within the reinforcing bar bending factory, interviews to a foreman of reinforcement works in the construction site were conducted twice and process analysis was performed. As a result, the following knowledge was obtained.
     1) Inside the reinforcing bar bending factory, workers are himself conduct sampling inspection of bending reinforcing bars. The confirmation items at that time are the information on the dimensions stated in "bending instruction tag".
     2) After bending work at the factory, "bending instruction tag" is used until distribution to work place on site. At the placing of bar used information of "reinforce drawing", and for final inspection "structure drawing" is used.
     3) The sub-contractor of the reinforcing bar performs the self-check during the placing of bar. A general contractor will inspect after the placing of bar is completed.
     We clarified the following contents from the investigation of the actual situation of the whole process of reinforcement works and workflow analysis.
     1) In reinforcement work information for connecting design and construction, the bend and check information is intensive on "bend command tag". The information described in the "structural diagram" is referred to in the creation of "construction drawing", "reinforce drawing" and "bending schedule", but bar bending, transportation, distribution and placing of bar bending Information of instruction tag is used.
     2) Since the information to be referred to changes during the process, it has the risk of mistakes in converting information.
     The workflow of the reinforcement work was partially optimized because the work was divided finely. Therefore, a mechanism for preventing a mistake of work between each work was not constructed. From now on, we think that the division of responsibility and roles in the production process in rebar work progresses more. In order to overcome the situation, it is possible to improve "productivity" by proceeding with "visualization" and "sharing" of information on bending processing and arranging muscle, and by not sending defective products to the subsequent process, and using ICT and BIM are important.
  • 新妻 尚祐, 工藤 桂一, 樋脇 毅, 中田 善久, 大塚 秀三, 宮田 敦典
    日本建築学会技術報告集
    2019年 25 巻 60 号 597-602
    発行日: 2019/06/20
    公開日: 2019/06/20
    ジャーナル フリー

    This paper deals with investigation in the actual state on social insurance situations and qualification allowance for rebar technician in Kanto area. Therefore, we investigated certified rebar worker and register rebar sent worker. Moreover, we conducted a questionnaire survey about social insurance situations and qualification allowance of rebar technician in Kanto area. As a result, Construction companies request deploying qualified person into construction sites, but in most cases Construction companies don’t pay rebar technician qualification allowance.

  • 武田 寿一
    計測と制御
    1992年 31 巻 1 号 238-241
    発行日: 1992/01/10
    公開日: 2009/11/26
    ジャーナル フリー
  • -施工段階における要因と影響に着目して-
    田村 篤, 金多 隆
    日本建築学会計画系論文集
    2018年 83 巻 750 号 1505-1515
    発行日: 2018年
    公開日: 2018/08/30
    ジャーナル フリー
     Building projects need many decision-making, and clients cooperate to decide with architects, supervisors, general contractors and other consultants in projects. Especially in Japan, because the project members trust each other and the ability of Japanese general contractors is excellent, clients often make a decision in construction phase. However, the laws in Japan don't define client's decision in construction phase clearly, and that often makes some kinds of risk (e.g., design change, delay of projects, and high cost). This paper aims to clarify factors and influence of client's decision-making in construction phase in Japan.
     There are three main laws related construction projects in Japan, Building Standards Act, Act on Architects and Building Engineers, and Construction Business Act. In addition, there are several standard specifications of construction work and standard forms of contract in Japan. These three laws and some standards define client's decision-making as follows. [1] if they find some mistakes in drawings in construction phase, clients must make architects correct it. [2] by agreement with the project member, clients can change drawings in construction phase. [3] if the design change affects structure, clients must perform structural calculation and obtain the application of building confirmation. [4] In case that it is reasonable to select in construction phase such as color, material and equipment, clients can select them in construction phase after clarifying in drawings.
     Therefore, we took the questionnaire about current status of client's decision-making involved in reinforcement work, steel work, exterior work, and equipment work. Questionnaire was an open-ended question method and composed of three questions as below. [1] what kind of client's decision-making is there? [2] what factors of decision-making are there? [3] what influence of decision-making is there? The sample was restricted to people in construction project and the respondents were belonged to clients, developers, architects, and general contractors. A total of 78 questionnaires were distributed by e-mail and 14 samples were collected.
     The results of survey revealed the difference of client's behavior between 4 works. In reinforcement work and steel work, clients do not decide and instruct the number of reinforcement and performance of a steel member directly. However, clients affect these works indirectly. In design phase, sometimes, clients do not decide certain use of space because they want to follow a trend or they have not decided tenant yet. In this case, clients decide these things in construction phase and that makes change the position of partition and piping sleeve in reinforcement work and steel work. In exterior work, it is reasonable to decide color and material of exterior in construction phase because clients cannot judge from only drawings whether the design is good. General contractors make mock-up for clients to check the design and clients decide or change the design detail directly. In equipment work, clients affect it in two ways. In case that it is reasonable to decide it in construction phase, clients decide the position, number, and performance of equipment directly. On other hand, in the case that clients decide use of space in construction phase, the use and size of the room determine the required position, number and performance of equipment.
     Finally, in order to analyze factors of client's decision-making, we applied the fishbone diagram analysis. Fishbone diagram is the tool for identifying the root causes of problem, which was “Client's decision-making in construction phase” in this paper. This diagram has 3 main causes (project member, building type, building element) and 42 secondary causes. In addition, it was modeled how client's decision-making in construction phase affects the post-process of four works.
  • 4 Day 工法
    石川 義則
    コンクリート工学
    1990年 28 巻 6 号 34-41
    発行日: 1990/06/01
    公開日: 2013/04/26
    ジャーナル フリー
    京成線のユーカリが丘駅前センターでは, 鉄筋コンクリート(RC)造の高層集合住宅3棟(29階建て1棟と31階建て2棟)が建設されている。わが国では6年前に初めて超高層RC工法によるRC造集合住宅が建設され, そのときは1フロアを12日で施工した。その後, 施工の経験を積み, 工事は6日/1フロアの施工スピードで行えるようになった。本稿は, 高層RC造の施工スピードとして記録的に速い4日サイクル/1フロアを達成することのできた新工法について述べるものである。
  • *市川 享祐, 坂口 剛
    人工知能学会全国大会論文集
    2018年 JSAI2018 巻 3K1-OS-18a-04
    発行日: 2018年
    公開日: 2018/07/30
    会議録・要旨集 フリー

    鉄筋工事
    において,配筋ミスの防止は重要な課題である.配筋とその検査に誤りがあった場合,建物の耐久性・強度に問題が生じる危険性がある.そのため,正確な検査が必要とされるが,人間による配筋検査は検査品質にばらつきが生じる上,多くの時間と手間を要する.鉄筋識別の手段として,鉄筋表面に記されたロールマークを目視する方法があるが,マークが小さくて見えにくい事,メーカーによってマークが異なる事などが問題視されている.本検討では,配筋検査における品質確保や検査に要する時間短縮を目的とし,畳込みニューラルネットワークによる鉄筋ロールマークの自動認識を試みた.また,Grad-CAMによる考察を行った.

  • 鉄筋工事計画/2
    越本 昌弘
    コンクリートジャーナル
    1970年 8 巻 6 号 33-42
    発行日: 1970/06/15
    公開日: 2013/04/26
    ジャーナル フリー
  • 鉄筋工事計画/1
    越本 昌弘
    コンクリートジャーナル
    1970年 8 巻 5 号 27-41
    発行日: 1970/05/15
    公開日: 2013/04/26
    ジャーナル フリー
  • 金子 智弥
    コンクリート工学
    2012年 50 巻 9 号 835-840
    発行日: 2012年
    公開日: 2013/09/01
    ジャーナル フリー
  • 共同住宅の建築プロジェクトにおけるケーススタディ
    斎藤 寛彰, 舘野 孝信
    日本建築学会技術報告集
    2018年 24 巻 56 号 391-395
    発行日: 2018年
    公開日: 2018/02/20
    ジャーナル フリー
    In recent years, it has become an issue in the construction management to improve productivity. Therefore, the authors surveyed man-hour rate of construction management business. The results of the survey, we revealed 436 tasks, and able to grasp the respective man-hours. In addition, we specified the business that should considered improvements, and discussed measures of improvements.
  • 林 静雄, 中澤 春生, 矢部 喜堂
    コンクリート工学
    2011年 49 巻 2 号 2_44-2_49
    発行日: 2011年
    公開日: 2012/02/01
    ジャーナル フリー
  • 殷 洛, 古阪 秀三
    日本建築学会計画系論文集
    2009年 74 巻 643 号 2057-2062
    発行日: 2009/09/30
    公開日: 2010/01/22
    ジャーナル フリー
    The specialist contractors in China include both the structural trade subcontractors and the equipment specialist contractors. In recent years, a part of the structural trade subcontractors expand the scope of the works from supplying only the labor to supplying both the labor and the material. In this paper, we clarify the state of the art of the specialist subcontractors' behaviors concerned with the scope of the work supplying both the labor and the material. Then we analyze their motive and feasibility to the work supplying both the labor and the material. Finally, we propose the structural trade subcontractors' direction of promotion in the future.
feedback
Top