2015 年 80 巻 709 号 p. 495-504
The purpose of this study is to investigate about constant effect about the plan of pioneer rehabilitation ward of large-scale rehabilitation room is not installed. It is the recovery period rehabilitation-ward adopted unit-construction in the space fixed a sickroom mainly on a private room. The following knowledge were obtained: 1. The way to spend times "out of Rehabilitation" and a design method of the space around the sickroom which is spent the time of about 2/3 at the daytime in particular in conjunction with it were important. 2. The number of steps to be generated in a time zone of "out of Rehabilitation" to occupy a time of about 80% between from 7:00 to 19:00 should be added at rehabilitation time. 3. It is important to adopt a mechanism and the idea urging by movement and going up and down, attitudinal variation at the near position in the sickroom of the patient to capture the hospitalization life whole for rehabilitation. As well as rehabilitation, designing to be able to use them as the space which patient can use routinely is important.