抄録
This paper describes about vertical transportation of building materials using high-speed temporary elevator for highrise office building construction. Surveying and analysing of the past constructions, a new method to estimate the times of vertical transportation for building construction was proposed. Applying this method to some current constructions, it is confirmed that this method is available for practical use.