主催: 電気・情報関係学会九州支部連合大会委員会
会議名: 平成29年度電気・情報関係学会九州支部連合大会
回次: 70
開催地: 琉球大学
開催日: 2017/09/27 - 2017/09/28
Integrating Renewable Energy Resources at distribution network is the interest of current studies in powersystem. Wind power among those is said to be intermittent resource. On the other side, the optimal battery energy storage system (BESS) investigated to be an efficient complement to wind power output. In this study, a robust multi-objective optimization technique NSGA II is proposed to obtain an optimum number of the wind turbine and scheduling of BESS. The proposed idea is applied to 162-Bus real distribution network to reveal the improvement in performance of the network.