生産システム部門講演会講演論文集
Online ISSN : 2424-3108
セッションID: 306
会議情報
306 実行期間が与えられた仕事に対するスケジューリング問題の提案と実行期間の調整法の提案(OS3-2 生産スケジューリング・生産管理II)
樋野 励早坂 健宏Jeremy BoxbergerSamuel Gomes
著者情報
会議録・要旨集 フリー

詳細
抄録
The objective of this research is to propose an optimization method in order to balance work loads for engineers joining in multiple projects. Every project is planned carefully to give appropriate work load to all engineers who join in the project and execute tasks. Though, since every engineer can join in the multiple projects, as a result, some engineers may be forced excessive work load to achieve the scheduled project plan. Therefore the project manager has to modify the project plan according to the necessities. There are feasible solutions to release the engineers from the excessive work load. In this paper, we propose a method for extending the operating term. The operating term is provided to execute the substance process of the task, which in general has longer time than the processing time. Since the processing time is fixed, the extension of the operating term causes the reduction of the work load.
著者関連情報
© 2013 一般社団法人 日本機械学会
前の記事 次の記事
feedback
Top