河川技術論文集
Online ISSN : 2436-6714
定期横断測量結果の河川管理・河床変動予測技術への活用に向けた検討
福島 雅紀武内 慶了坂野 章箱石 憲昭
著者情報
ジャーナル フリー

2008 年 14 巻 p. 97-102

詳細
抄録

Cross-section surveying has been conducted every two to five years in a first class river. The data have a large amount of information, and they were mainly used for river channel planning. In this study, it was investigated to apply the data to improving river maintenance works more efficient and effective, and setting riverbed condition for simulation of riverbed change. As a result, the data can be used for determining sections where intensive maintenance works should be implemented because of decreasing of discharge capacity, concerning local scouring and forestation and so on. Additionally, thickness of riverbed sediment can be estimated at each section differently, which would contribute to improve accuracy of numerical simulation.

著者関連情報
© 2008 土木学会
前の記事 次の記事
feedback
Top