Abstract
Inventory control problem under demand uncertainty is discussed. Usually, the production plan is regenerated periodically. In this study, the production planning method in which the re-planning is embedded to the formulation is proposed. For the multi-term production planning problem with multiple transportation methods, the advantage of the proposed method is evaluated.