Abstract
Multi-period production planning problem under demand uncertainty is discussed. The objective of the problem is to minimize the sum of the inventory holding cost and the penalty for unfulfilled order. The result obtained by using the Lagrange multipliers shows that the optimal production rate of each product is simply obtained from the production rate for the problem without constraints.