抄録
There are several problems due to improper flushing prior to the operation in closed air-conditioning piping system made of galvanized steel pipes. The authors tried to find the practical flushing documents for air-conditioning piping systems, but couldn't get the sufficient documents through the literature survey. This paper describes not only the general outlines of the documents picked up, but also future issues.