日本水産学会誌
Online ISSN : 1349-998X
Print ISSN : 0021-5392
ISSN-L : 0021-5392
ホタテガイ養殖業の分散・耳吊り作業における作業者と機械設備の最適配分法
浜田 武士山下 成治見上 隆克橋本 忍
著者情報
ジャーナル フリー

1997 年 63 巻 2 号 p. 171-177

詳細
抄録

The thinning and ear hanging work of scallop aquaculture can be regarded as a line production system.
Previous studies evaluated the optimization of an assembly line using the sum of labor and facility cost per day. This paper introduces a new evaluation measure to improve work system based on two points as follows; (1) To convert the operation efficiency to production cost; and (2) To transform the fixed cost of the facility to a total depreciation per planned production quantity.
The results of the calculation show that the new evaluation measure is the most suitable for the work, because the work system optimized by the new evaluation measure has a greatly higher efficiency and fewer facilities than that produced by the previous evaluation measure.

著者関連情報
© 社団法人 日本水産学会
前の記事 次の記事
feedback
Top