1. The log-making production rate (felling, trimming and bucking of 12′ logs by man-power) per net working hour is given by the formula(1).
2. The production rate per day is given by the formula (2).
3. The results of time-study relating to the varied conditions of trees and for the separate stages of the operation are shown in the formula (3)-(9).
4. For the economy of the intensive utilization, the critical condition is given in the following equation, in which the production rate and the utilization percentage by volume are taken into account.
where, R′ =Utilization percentage by volume in the usual logging operation and in the intensive operation respectively.
L, L′=Production rate per day per man.
G=Stampage cost (Unit cost including measurement overheads)
E=Production cost (Unit cost of log making)
x=Wage of worker per day per man.