加速器
Online ISSN : 2436-1488
Print ISSN : 1349-3833
7 巻, 4 号
選択された号の論文の17件中1~17を表示しています
巻頭言
解説
話題
  • 若杉 昌徳, 宮下 裕次, 戸ケ崎 衛, 竹原 広樹, 堀 利匡, 原 雅弘, 市川 進一, 高橋 弘範, 玉木 聖一, 小泉 浩二, 森屋 ...
    2011 年 7 巻 4 号 p. 271-277
    発行日: 2011/01/31
    公開日: 2023/03/01
    ジャーナル フリー

    We are now constructing an experimental system for electron scattering of short-lived unstable nuclei using a novel target forming technology SCRIT at the Nishina Center for Accelerator Based Science in RIKEN. In this paper, we present the construction and the commissioning of the electron accelerators, and status of the preparations for the world’s first electron scattering experiment for unstable nuclei is reported.

  • 田中 博文
    2011 年 7 巻 4 号 p. 278-284
    発行日: 2011/01/31
    公開日: 2023/03/01
    ジャーナル フリー

    An ultra-compact 990 keV electron accelerator―called the “laptop accelerator”―that is only about the size of a human palm, with an external diameter of 150 mm and a weight of 10 kg has been developed. The device can emit an X-ray beam with a diameter of 10 μm. Expected applications are in non-destructive tests and diagnostic devices.

  • 渡邉 裕, 池沢 英二, 大西 純一, 熊谷 桂子, 込山 美咲, 藤縄 雅, 藤巻 正樹, 眞家 武士, 山澤 秀行, 横内 茂, 渡邉 ...
    2011 年 7 巻 4 号 p. 285-293
    発行日: 2011/01/31
    公開日: 2023/03/01
    ジャーナル フリー

    As the third injector of the RIKEN Ring Cyclotron (RRC), RILAC2 has been constructed in order to increase the beam intensity of uranium beam at the RIKEN RI beam factory. The RILAC2 consists of a superconducting ECR ion source (SCECRIS) with an operational frequency of 28 GHz and the linac system (RFQ followed by three drift-tube linacs, DTL1, DTL2 and DTL3). The installation of DTL1, DTL2 and DTL3 started in February 2010 next to the AVF injector site. The SCECRIS, after tested in RILAC pre-injector of high voltage terminal, was installed in newly constructed small building outside of Nishina memorial building. The RFQ were installed in the spring 2010 after its operation frequency was slightly changed. The construction of beam lines (LEBT and HEBT) followed it. The construction will soon finish and the beam commissioning with a Xe beam will start at the end of 2010. It is expected that beam intensity of uranium beam will be improved much in the autumn 2011.

会議報告
賛助会員のページ
掲示板(関連会議情報・会告)
第7巻 総目次
投稿募集・投稿の手引き・広告掲載依頼・入会申込書・変更届・賛助会員名簿
feedback
Top