This evaluation study of the heat source system is for contribution of spreading commissioning for office buildings. In fact, this study is similar to commissioning, not exactly commissioning according to "Shase Guideline". However, the measurement, analysis and evaluation of the office building were performed according to the guideline to show the actual example of the performance evaluation on post-acceptance step. As a result, the following had been shown. 1) It was confirmed that all equipment were controlled and performed as well as system design specification except for air-heat-source chillers. 2) Considering a cost performance, although equipment design did not have high end specification, energy saving result as a whole building was observed compared with general office buildings.
View full abstract