Tsukuba Institute of Construction Technology, Toda Construction Co., Ltd. is located in the north west of Tsukuba Science City. The 2 storied general testing building was designed and constructed by“TO-RPC System”Toda prefabricated reinforced concrete structure system. This system is for R.C. (Reinforced Concrete) building, consisting of precast columns, girders, beams respectively, composite floor of P.C. (Precast Concrete) pannels, P.C. curtain walls and R.C. shear walls cast in situ. The construction period for one floor with in 2000m
2 is only 14 days.
View full abstract