In case of pire structures, reinforcing steel bars are cut off by the way, then those are resulted to be anchored in tencile zone of members. Some pier structures are damaged by earthquake near those section.
Presented in this paper are
(1) Results of a series of experiments by using modified specimens on failure mechanism of those members.
(2) Some rational proposal for structural design method concerning to earthquake.
(3) On the basis of the results obtained;
Resisting moment capacity of anchored zone will be raised till equivalent level as base of piers, which guarantee 1.5 times against calculated moment.
抄録全体を表示